BusinessGujaratHeadlineInfrastructureNational

Patel Infrastructure Sets World Records in 24-Hour Road Construction Feat on UP’s Under Construction Ganga Expressway Project

  • A 6-lane expressway built in record-breaking time between Hardoi and Unnao
  • Recognized by Golden Book of World Records, India Book of Records, and Asia Book of Records
  • 24 Lane kilometres in length

National 20th May, 2025 – Patel Infrastructure Ltd., (PATEL) GUJARAT, one of the contributing pioneers in the country’s construction scene has etched its name in history by setting a World Record for the fastest construction of a 6 lane Ganga Expressway project which happens to be the INDIA’S longest expressway owned by a state, a dream project of dynamic and visionary chief minister of Uttar Pradesh SHREE YOGI ADITYANATH ji .

This world record consists laying of bituminous concrete on 34.24 kilometres, using 20,105 metric tons of bituminous concrete and covering 1,71,210 square meters, all within 24 hours of non-stop operations and 10km of metal beam crash barrier installation by and PATEL ancillary company ROAD SHIELD PRIVATE LIMITED. This achievement has been officially recognised and authenticated by three major record authorities-Golden Book of World Records, India Book of Records, and Asia Book of Records.

The WORLD RECORD was made possible under the vision and supervision of UPEIDA CEO Shri MANOJ KUMAR SINGH. With full support from local and state authorities – The completion of this critical stretch holds immense significance for both the local region and the state of Uttar Pradesh, serving as a catalyst for regional development and national connectivity.

The record-setting effort took place on the prestigious Ganga Expressway Project (Group-3) a project of  ADANI ROAD AND TRANSPORT LIMITED (ARTL) An ADANI GROUP COMPANY , a landmark infrastructure initiative spearheaded by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA), between Hardoi and Unnao districts. Operations commenced sharply at 5:00 AM on May 17, 2025, and was accomplished by 5:00 AM on May 18, 2025 beating target quantities, involving a highly coordinated effort of engineers, machinery, materials, and skilled labour working seamlessly for 24 hours straight.

Mr.Arvind Patel, Managing Director, Patel Infrastructure Ltd. “We are proud to be contributing to nation-building through such monumental achievements. This is not just a record, it’s a reflection of Indian engineering brilliance and our team’s unwavering spirit”.

Related posts

Corteva Agriscience’s Bold New Program to Drive 2 Million Women to the Forefront of India’s Agri-Value Chain by 2030

expressgujaratnews_editor

ICONIC FIRST: myTrident Redefines the Home Decor space bringing together Sharmila Tagore & Kareena Kapoor Khan in its latest campaign

expressgujaratnews_editor

Lifetime Partner Plan: Your Diwali Investment in Lifelong Prosperity

Leave a Comment